Customization: | Available |
---|---|
Material: | Plastic |
Blade Material: | Plastic |
Still deciding? Get samples of US$ 0.01/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Do you have detailed product specifications ?
Model |
Bearing Type | Rated Voltage |
Operation Voltage | Current |
Speed |
Air Flow | Static Pressure |
Noise Level |
Weight |
VDC | VDC | A | RPM | CFM | mmH20 | dBA | g | ||
DFH8025S | Sleeve | 12 | 10.8~13.2 | 0.17 | 3000 | 38.88 | 3.54 | 32.3 | 75 |
DFM8025S | 0.11 | 2500 | 32.37 | 2.52 | 27.9 | ||||
DFL8025S | 0.08 | 2000 | 25.64 | 1.64 | 22.1 | ||||
DFH8025B | Ball | 0.17 | 3000 | 38.88 | 3.54 | 32.3 | |||
DFM8025B | 0.11 | 2500 | 32.37 | 2.52 | 27.9 | ||||
DFL8025B | 0.08 | 2000 | 25.64 | 1.64 | 22.1 | ||||
DFH8025S | Sleeve | 24 | 21.6~26.4 | 0.15 | 3000 | 38.88 | 3.54 | 32.3 | |
DFM8025S | 0.10 | 2500 | 32.37 | 2.52 | 27.9 | ||||
DFL8025S | 0.07 | 2000 | 25.64 | 1.64 | 22.1 | ||||
DFH8025B | Ball | 0.15 | 3000 | 38.88 | 3.54 | 32.3 | |||
DFM8025B | 0.10 | 2500 | 32.37 | 2.52 | 27.9 | ||||
DFL8025B | 0.07 | 2000 | 25.64 | 1.64 | 22.1 |
FAQ
Q: How many workers do you have and how many production lines do you own ?
A: We have 207 workers in normal time, we employ more workers in peak season, about 250 workers.
We own 7 production lines.
Q: What's bearing type do you have and what is their lifetime difference?
A: We have sleeve bearing, hydraulic sleeve bearing and dual ball bearing. If sleeve fan, the lifetime is 25000hours, if hydraulic sleeve bearing, the lifetime is 30000hours, if ball bearing, the lifetime is 50000hours.
Q: Can you customize required fan or blower?
A: Of course, we have a professional engineering team which can design and develop new fans or blowers according to customer's requirements.
Q: Can my order ship via UPS or DHL or FedEx or by Air or By Sea? And where is my order ship ?
A: Yes, we can ship. All orders ship from our factory warehouse.
Q: What is your MOQ and lead time ?
A: Our MOQ is 1K. Lead time depends on the order's quantity, below 50K, the lead time is 15 working days; if over 50K, the lead time is 20 working days.
If you have any question about our product contact me anytime .
Website:d-fans.en.made-in-china.com